Wednesday, June 16, 2010

SAP Order Status Teco

Teco means Ending of Order for logical view.

Below Action will be executed as order gets status Teco.

1. The Order would not be relevant to MRP.
2. All reservation against Order will be Deleted.
3. Capacity Requirement against order would be deleted.
4. Purchase Requisition for External Operation Or non Stock Items will be cleared.
5. The Order and its operation gets status Teco.
6.Material Posting Can e Made to Order even after Teco , this setting is on need basis
if we want that after Teco No posting should be allowed then Can be control by
Order Status control t code Bs22

1 comment:

Blog Archive

Followers